Here is the set of instructions to be followed in
Anna University Examination to get higher marks
even though you are not thorough in the subject...
1. Use Blue and Black color pen for writing the
exam. use black for headings and key points.
2.Read the question carefully.
3.Should attend all the questions. If
you don't know the answers for
any questions,write relevant answers for it.
4.Put question numbers and sub division properly.
5.Draw necessary diagrams with pencils and
scales only.
6.Don't leave any empty pages in between the
written pages.
7.Properly Organize the time duration to attend all
questions within the given time.
8. Allot 30 mins to write Part-A and allot 25 mins
for each Part B.
9.Handwriting must be neat and readable.
PRESENTATION PLAYS AN IMPORTANT ROLE IN
GETTING GOOD MARKS
Showing posts with label Did You Know?. Show all posts
Showing posts with label Did You Know?. Show all posts
Monday, November 11, 2013
Tips for anna university exams
Labels:
Did You Know?
Sunday, September 15, 2013
METHODS & UNITS OF MEASUREMENTS OF CIVIL WORKS
METHODS & UNITS OF MEASUREMENTS OF CIVIL WORKS
The units of measurements (UOM) for civil engineering works are mainly categorised for their nature, shape and size and for making payments to the contractor and also. The principle of units of measurements normally consists the following:
a) Single units work like doors, windows, trusses etc., are expressed in numbers.
b) Works consists linear measurements involve length like cornice, fencing, hand rail, bands of specified width etc., are expressed in running metres (RM)
c) Works consists areal surface measurements involve area like plastering, white washing, partitions of specified thickness etc., and are expressed in square meters (m2)
d) Works consists cubical contents which involve volume like earth work, cement concrete, Masonry etc are expressed in Cubic metres.
Table below shows units of measurement of various items of civil engineering works based on IS 1200.
Sl. No.
|
Particulars of item
|
Units of measurement
|
Units of payment
|
1
|
Earthwork
| ||
1. Earthwork in excavation
|
CUM
|
Per CUM
| |
2. Earthwork in filling in foundation trenches
|
CUM
|
Per CUM
| |
3. Earth work in filling in plinth
|
CUM
|
Per CUM
| |
2
|
Concrete
| ||
1. Lime concrete in foundation
| |||
2. Cement concrete in lintels
| |||
3. RCC in slab
| |||
4. Cement concrete or RCC in chujja, sunshade
| |||
5. Lean concrete in roof terracing (thickness specified)
|
SQM
|
Per SQM
| |
6. Cement concrete bed
|
CUM
|
Per CUM
| |
7. Reinforced concrete sunshade (specified width and height)
|
CUM
|
Per CUM
| |
3
|
Damp proof course (DPC) – thickness mentioned
|
SQM
|
Per SQM
|
4
|
Brick work
| ||
1. Brickwork in foundation
|
CUM
|
Per CUM
| |
2. Brickwork in plinth
| |||
3. Brickwork in super structure
| |||
4. Thin partition walls
|
SQM
|
Per SQM
| |
5. Brickwork in arches
|
CUM
|
Per SQM
| |
6. Reinforced brickwork
|
CUM
|
Per CUM
| |
5
|
Stone work
| ||
1. Stone masonry
|
CUM
|
Per CUM
| |
6
|
Wood work
| ||
1. Doors and windows frames or chaukhats, rafters, beams
|
CUM
|
Per CUM
| |
2. Shutters of doors and windows (thickness specified)
|
SQM
|
Per SQM
| |
3. Doors and windows fittings (like hinges, tower bolts, sliding bolts, handles)
|
Earch
|
Per Each
| |
7
|
Steel work
| ||
1. Steel reinforcement bars etc in RCC and reinforced brick work
|
Quintal
|
Per Quintal
| |
2. Bending, binding of steel reinforcement
|
Quintal
|
Per quintal
| |
3. Rivets, bolts and nuts, anchor bolts, lewis bolts, holding down bolts
|
Quintal
|
Per quintal
| |
4. Iron hold fasts
| |||
5. Iron railing (height and types specified)
| |||
6. Iron grills
|
SQM
|
Per SQM
| |
8
|
Roofing
| ||
1. RCC and RB slab roof (excluding steel)
|
CUM
|
Per CUM
| |
2. Lean concrete roof over and inclusive of tiles or brick or stone slab etc (thickness specified)
|
SQM
|
Per SQM
| |
3. Centering and shuttering formwork
|
SQM
|
Per SQM
| |
4. AC sheet roofing
|
SQM
|
Per SQM
| |
9
|
Plastering, points and finishing
| ||
1. Plastering – cement or lime mortar (thickness and proportion specified)
|
SQM
|
Per SQM
| |
2. Pointing
|
SQM
|
Per SQM
| |
3. White washing, colour washing, cement washing, (number of coats specified)
|
SQM
|
Per SQM
| |
4. Distempering (number of coats specified)
|
SQM
|
Per SQM
| |
5. Painting, varnishing (number of coats specified)
|
SQM
|
Per SQM
| |
10
|
Flooring
| ||
1. 25mm cement concrete over 75mm lime concrete floor (including lean concrete)
|
SQM
|
Per SQM
| |
2. 25mm or 40mm cement concrete floor
|
SQM
|
Per SQM
| |
3. Doors and window sills (CC or cement mortar plain)
|
SQM
|
Per SQM
| |
11
|
Rain water pipe / plain pipe
|
RM
|
Per RM
|
12
|
Steel wooden truss
|
Each
|
Per each
|
13
|
Glass panels (supply)
|
SQM
|
Per SQM
|
14
|
Fixing of glass panels or cleaning
|
Each
|
Per Each
|
Note:
- SQM = Square meter
- CUM = Cubic meter
- RM = Running meter
Methods for Measurement of civil engineering works:
The rules for measurement of each item are invariably described in IS – 1200. However some of the general rules are listed below:
1. Measurement shall be made for finished item of work and description of each item shall include materials, transport, labour, fabrication tools and plant and all types of overheads for finished the work in required shape, size and specification.
2. In booking, the order shall be in sequence of length, breadth and height or thickness.
3. All works shall be measured subject to the following tolerances.
- Linear measurement shall be measured to the nearest 0.01m.
- Areas shall be measured to the nearest 0.01 SQM
- Cubic contents shall be worked out to the nearest 0.01 cum.
4. Same type of work under different conditions and nature shall be measured separately under separate items.
5. The bill of quantities shall fully describe the materials, proportions, workmanships and accurately represent the work to be executed.
6. In case of masonry (stone or brick) or structural concrete, the categories shall be measured separately and the heights shall be described as:
- From foundation to plinth level
- From plinth to first floor level
- From first floor to second floor level and so on.
LABOUR REQUIREMENT FOR VARIOUS BUILDING WORKS
LABOUR REQUIREMENT FOR VARIOUS BUILDING WORKS
ABOUR REQUIREMENT FOR VARIOUS BUILDING WORKS:
The table below shows the recommended labour requirement for various civil engineering/building/construction works:
S.No.
|
Description of work
|
Unit
|
Labour
|
Recommended constant in days.
|
Remarks
|
1)
|
Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge)
|
M3
|
Mate
Labour
|
0.06
0.62
|
_
_
|
2)
|
Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge)
|
M3
|
Mate
Labour
|
0.05
0.50
|
_
_
|
3)
|
Returning, filling and rammingof excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m
|
M3
|
Mate
Labour
Bhisti
|
0.02
0.25
0.02
|
_
_
_
|
4)
|
Concrete :
Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate)
|
M3
|
Labour
Bhisti
Mixer operator
Mixer
|
0.50
0.10
0.07
0.07
|
_
_
_
_
|
5)
|
Mixer mixed cement concrete
|
M3
|
mason
Labour
bhisti
mixer operator
mixer
vibrator
|
0.10
1.63
0.70
0.07
0.07
0.07
|
_
_
_
_
_
_
|
6)
|
Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement
|
M3
|
mason
Labour
bhisti
mixer operator
mixer
vibrator
|
0.17
2.00
0.90
0.07
0.07
0.07
|
The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
|
7)
|
Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement.
|
M3
|
mason
Labour
bhisti
mixer operator
mixer
vibrator
|
0.24
2.50
0.90
0.07
0.07
0.07
|
_
_
_
_
_
_
|
8)
|
Mortars :
Mixing by hand, cement mortar of any mix/proportions
|
M3
|
Labour
Bhisti
|
0.75
0.07
|
Labour required will be approximately same for different mix proportions.
|
9)
|
Brick work (straight walls) :
Brick work in walls exceeding one brick thick, in cement / lime mortar
|
M3
|
mason
Labour
bhisti
|
0.94
1.80
0.20
|
The constants include labour involved in scaffolding.
|
10)
|
Brick work in walls, one brick thick, in cement/lime mortar
|
M2
|
mason
Labour
bhisti
|
0.25
0.40
0.10
|
The constants could be adopted for brick work with any mix or mortar.
|
11)
|
Formwork :
a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork :
1) rectangular column and walls
2) suspended floors/roofs
3) sides and soffits of beam
|
M3
M2
M2
|
Carpenter
Labour
Carpenter
Labour
Carpenter
Labour
|
0.25
0.20
0.23
0.20
0.30
0.20
|
_
_
_
_
_
_
|
12)
|
Reinforcement:
Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete
|
Quintal
|
Bar bender
Labour
|
1.00
1.00
|
_
_
|
13)
|
Plastering and pointing :
a) 15mm thick cement plaster to ceiling including mixing of mortar.
b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar
c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.
|
M2
M2
M2
|
mason
Labour
bhisti
mason
Labour
bhisti
mason
Labour
bhisti
|
0.08
0.10
0.10
0.06
0.10
0.10
0.10
0.15
0.10
|
_
_
_
_
_
_
_
_
_
|
14)
|
Damping proof course :
a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.
|
M3
|
Mason
Labour
bhisti
|
0.10
0.10
0.01
|
_
_
_
|
Note: Bhisti means water carrier.